Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : NE3105305 Federal Type : C
Water System Name : NORTH BEND, CITY OF State Type : C
Principal County Served : DODGE Primary Source : GW
Status : A Activity Date : 07-01-1977

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 06-01-2020 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
001 TREATMENT PLANT 001 504 EPA 504.1 1 RT 3Y Monitoring Completed 01-01-2031 to 12-31-2031
001 TREATMENT PLANT 001 505 EPA 505 1 RT 6Y Monitoring Partially Completed 01-01-2029 to 12-31-2034
001 TREATMENT PLANT 001 515 EPA 515.3 1 RT 3Y 01-01-2028 to 12-31-2028 01-01-2031 to 12-31-2031
001 TREATMENT PLANT 001 524 EPA 524.2 1 RT 3Y Monitoring Partially Completed 01-01-2031 to 12-31-2031
001 TREATMENT PLANT 001 525 EPA 525.2 1 RT 3Y 01-01-2027 to 12-31-2027 01-01-2029 to 12-31-2031
001 TREATMENT PLANT 001 531 EPA 531.1 1 RT 3Y 04-01-2028 to 06-30-2028 04-01-2031 to 06-30-2031
001 TREATMENT PLANT 001 549 EPA 549.2 1 RT 3Y 01-01-2027 to 12-31-2027 01-01-2030 to 12-31-2030
001 TREATMENT PLANT 001 GARA GR ALP, RA 226 & 228 1 RT 6Y Monitoring Partially Completed 01-01-2030 to 12-31-2030
001 TREATMENT PLANT 001 IOC5 IOC PHASE 5 1 RT 6Y 01-01-2028 to 12-31-2028 01-01-2034 to 12-31-2034
001 TREATMENT PLANT 001 P2IC PHASE 2 IOC-ARS 1 RT 6Y 01-01-2027 to 12-31-2027 01-01-2033 to 12-31-2033
950 DISTRIBUTION SYSTEM PBCU LEAD AND COPPER 10 RT 3Y Monitoring Partially Completed 06-01-2031 to 10-30-2031
Total Number of Schedules Displayed = 11

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
001 TREATMENT PLANT 001 1005 ARSENIC 1 RT 6Y Monitoring Completed 01-01-2029 to 12-31-2029
001 TREATMENT PLANT 001 1038 NITRATE-NITRITE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
950 DISTRIBUTION SYSTEM 1025 FLUORIDE 1 SP MN ----- -----
950 DISTRIBUTION SYSTEM 2456 TOTAL HALOACETIC ACIDS (HAA5) 1 RT YR Monitoring Completed 08-01-2027 to 08-31-2027
950 DISTRIBUTION SYSTEM 2950 TTHM 1 RT YR Monitoring Completed 08-01-2027 to 08-31-2027
Total Number of Schedules Displayed = 5

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
INITIAL MONITORING FOR PFOA (2806) 2027-04-26 04-26-2027
INITIAL MONITORING FOR PFOS (2805) 2027-04-26 04-26-2027
Total Number of Compliance Schedules Displayed = 2

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sat Sep 12 08:38:01 CDT 2026