Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : NE3150049 Federal Type : NC
Water System Name : SUNSET INN State Type : NC
Principal County Served : BUFFALO Primary Source : GW
Status : A Activity Date : 04-07-1997

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 08-01-2022 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
G-115435 WELL 031 1038 NITRATE-NITRITE 1 RT YR initialized initialized
Total Number of Schedules Displayed = 1

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
101 SUBMIT WRITTEN RESPONSE 30 DAYS 07-18-2024
200 3-004.01A SUBMIT SAMPLE SITE PLAN 10-15-2024
910 9-003 APPLY FOR A PWS PERMIT TO OP 10-15-2024
T008 21-004 ITEM 4 TNC EMER CONTACT LIST 10-15-2024
LVL1 TTT TC+/EC- WO RPTS 01-11-2025 01-11-2025
9.01 OBTAIN PWS PTO KEEP AVAIL FOR INSP 06-11-2025
Total Number of Compliance Schedules Displayed = 6

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Mar 01 15:07:10 CST 2026